The following pictures illustrate the latest progress from both Tyseley and Llangollen.
At Tyseley the coupling rods have been fitted to the wheels, whilst preparation of the connecting rods has taken place adding paint to the rear of the rods. The boiler is edging ever nearer to completion with the fire hole inner and outer sheets riveted. At Llangollen the further painting of the tender is ongoing.