Engineering Progress

Progress on building 6880 is continuing as the following photographs show.

These bolts are for fixing the Extension Frames to the Main Frames

This is one of the Brake Shaft Castings

This is a view of the front end showing the cast brackets to support the front buffer beam

The footplating has been secured to the frames and painted