as the following photographs illustrate, both the pistons and valves are now in the cylinders and the end caps fitted. Also the brake rigging is on.
‘The boiler is making progress too with the large tubes now on site and the ‘bottle ends’ are being fitted. Finally the superheater elements are being manufactured.