Boiler Trial Fitted

The boiler has been trial fitted into the locomotive to determine clearances and any other work needed before the tubes are fitted and an hydraulic test carried out. The work on the firebox is complete and the front taper section has been bolted on. The smoke box will be connected too before further work takes place.